Document a risk record and remediation measure
How to document an identified risk for workers in the value chain in Due Diligence Documentation, derive a linked remediation measure from it and evidence its effect until the blocking completeness check passes.
An identified risk for workers in the value chain is only documented defensibly once a remediation measure is linked to it and its outcome has been recorded. This guide takes you through the three steps in “Due Diligence Documentation”.
Prerequisites
- The associated due diligence process exists in the current reporting period.
- You are working in “Workers in the value chain → Due Diligence Documentation” and have opened the process detail page.
- If you want to assign a measure to a risk, that risk must already exist as a risk record.
Record the risk
- On the process detail page, open the “Risk Identification Records” tab.
- Click “Add Risk”. The “Add Risk Identification Record” dialog opens on the right.
- Complete the “Risk Classification” section: “Subtopic” (mandatory field, the S2 subtopics from
Working ConditionstoOther Labour Rightsas well asMultiple / Cross-Cutting), “Severity” (Low,Medium,HighorCritical) and “Mitigation Status” (mandatory field, preselected asIdentified). - Complete the “Risk Details” section: “Description” (mandatory field), “Identification Method” – for example audit or media analysis – and “Date Identified” (mandatory field, prefilled with the current date).
- If needed, complete the “Scope” section with “Geographic Scope”, “Value Chain Tier” and “Affected Worker Category”.
- Click “Create”. The risk appears in the table of the tab and is counted in the “Risks Identified” metric.
Derive the remediation measure
- On the same process, switch to the “Remediation Records” tab and click “Add Remediation”. The “Add Remediation Record” dialog opens on the right.
- In the “Classification” section, choose the “Remediation Type” (
Corrective,Preventive,CompensationorSystemic) and set “Linked Risk Record” to the risk record you just created. Enter an external reference number in “External Reference”. - Complete the “Details” section. “Description”, “Responsible Party”, “Start” and “Planned Completion Date” (prefilled with three months after the start) are mandatory fields; “Affected Parties” is optional.
- Click “Create”. The measure appears with status “Planned”, the planned date is displayed as “Due Date”, and the measure counts toward the “Open Remediations” metric.
Evidence the effect
- In the “Remediation Records” tab, click the row of the measure and then click “Edit” on its detail page.
- In the “Edit Remediation Record” dialog, update the “Status” and add “Actual Completion Date”, “Outcome Description” and “Lessons Learned”. Save with “Save”.
- If the measure has demonstrably mitigated the risk, open the risk record, click “Edit” and set the “Mitigation Status” field in the “Edit Risk Identification Record” dialog to
Mitigated. - Check the result via “Actions → Validate completeness” in the “DD Processes” section. The blocking check “High/critical severity risks have linked remediation records” must pass – otherwise risks with severity
HighorCriticalwithout a linked measure count as a blocking deficiency.
Run the completeness check early and regularly: it shows exactly which processes you still need to activate or link with remediation measures before the reporting period can be completed.